4.4 Do a check of the pre-tension
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Intermediate 1
Support equipment
Description Part No. CSN QTY
HP oil pump 94931 pc 1
HP hose A/R pc 1
Hydraulic unit 94942 pc 1
Round bar - kit 94005 pc 1
Pre-tensioner A/R A/R
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
WARNING
Injury hazard: Hydraulic tools can cause injury to personnel. Always put on gloves, a
face shield and safety goggles when you do work with hydraulic tools.
PRELIMINARY OPERATIONS
• The engine must be stopped.
X72DF
AA00-0000-00AAA-360A-A
Maintenance Manual Do a check of the pre-tension
Winterthur Gas & Diesel Ltd.
- 96 - Issue 002 2020-10