8.1 Crankshaft
8.1.1 Crankshaft - do a check of the crank deflection
Periodicity
Description
Working hours 6000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 6.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Dial gauge 94305 1
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
WARNING
Injury Hazard: Before you operate the turning gear, make sure that no personnel are near
the flywheel or in the engine.
PRELIMINARY OPERATIONS
• The engine must be stopped and made safe for maintenance, refer to section 4.1 Do
maintenance work - general procedure
X72DF
AA00-3103-00AAA-360A-A
Maintenance Manual Crankshaft - do a check of the crank deflection
Winterthur Gas & Diesel Ltd.
- 350 - Issue 002 2020-10