7.5.3 Cylinder cover - grind the sealing face for pilot injection valve
Periodicity
Description
Unscheduled as necessary
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Grinding device 94270-02 1
Stencil 94270-2D 1
Stud bolts 94270-F 2
Supplies
Description QTY
Emery cloth A/R
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
• None
PRELIMINARY OPERATIONS
• The pilot injection valve must be removed, refer to the related procedure.
X72DF
AA00-2708-00AAA-655B-A
Maintenance Manual Cylinder cover - grind the sealing face for pilot injection valve
Winterthur Gas & Diesel Ltd.
- 244 - Issue 002 2020-10