7.10.7 Pilot injection valve - install
Periodicity
Description
Working hours 24 000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Assembly tool 94289E 1
Stud bolts 94270F 2
Supplies
Description QTY
White spirit A/R
Never Seez NSBT A/R
Spare Parts
Description Part No. CSN QTY
Pilot injection valve 1
Seal 1
O-rings 4
SAFETY PRECAUTIONS
None
PRELIMINARY OPERATIONS
The pre-chamber must be installed, refer to section 7.10.6 Pilot injection valve - install the
pre-chamber
The injection module must be installed, refer to section 7.10.3 Pilot injection valve - install
the injection module
X72DF
AA00-2790-00AAA-720A-A
Maintenance Manual Pilot injection valve - install
Winterthur Gas & Diesel Ltd.
- 344 - Issue 002 2020-10

Table of Contents

Questions and Answers:

WinGD X62DF Specifications

General IconGeneral
BrandWinGD
ModelX62DF
CategoryEngine
LanguageEnglish

Related product manuals