3 - 1
3
1
OVERVIEW
2
BUS CONNECTION
3
DIRECT CONNECTION
TO CPU
4
COMPUTER LINK
CONNECTION
5
MELSECNET/10
CONNECTION (PLC TO
PLC NETWORK)
6
CC-Link CONNECTION
(INTELLIGENT DEVICE
STATION)
7
CC-Link CONNECTION
(Via G4)
8
ETHERNET
CONNECTION
DIRECT
CONNECTION TO
CPU
3.1 System Configuration . . . . . . . . . . page 3-2
This section describes the equipment and cables needed
for direct connection to a CPU.
Select a system suitable for your application.
3.2 Connection Cable . . . . . . . . . . . . page 3-18
This section describes the specifications of the cables
needed when connecting a GOT to a FX PLC.
Check the specifications of the connection cables.
3.3 Preparatory Procedure for Monitoring
. . . . . . . . . . . . . . . . . . . . . . . . . . page 3-20
This section describes the procedures to be followed
before monitoring in direct connection to a CPU.
The procedures are written on the step-by-step basis so
that even a novice GOT user can follow them to start
communications.
3.4 Precautions . . . . . . . . . . . . . . . . . page 3-35
This section describes the precautions about servo
amplifier connection.
Refer to this section without fail before monitoring
FXCPU(FX3U/FX3UC series).
3.5 List of Functions Added by Version Upgrade
. . . . . . . . . . . . . . . . . . . . . . . . . . page 3-36
This section describes the functions added by version
upgrade of GT Designer2 or OS.