27.2 MELSECNET/10 Connection (PLC To PLC Network)
27.2.2 Preparatory Procedures for Monitoring
27 - 23
25
BAR CODE READER
CONNECTION
26
PRINTER CONNECTION
27
CNC CONNECTION
28
MULTI-CHANNEL
FUNCTION
29
FA TRANSPARENT
FUNCTION
30
MULTIPLE-GT11
CONNECTION FUNCTION
31
GATEWAY FUNCTION INDEX
27.2.2 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Comfirming the CNC side setting
This section explains the GOT side setting.
When confirming the CNC side setting, refer to the following.
Section 27.2.10 CNC Side Settings
Install the OS on the GOT.
Section 27.2.3
Installing OS onto GOT
Make sure that the OS is installed on the GOT.
Section 27.2.4
Checking OS installation on GOT
Set the communication interface.
(Communication settings)
Section 27.2.5
Setting communication interface
(Communication settings)
Download the project data.
Section 27.2.6
Downloading project data
Attach the communication unit and connect the cable.
Section 27.2.7
Attaching communication unit and
connecting cable
Make sure that the GOT recognizes the connected
equipment.
Section 27.2.8
Verifying GOT recognizes connected
equipment
Make sure that monitoring is performed normally.
Section 27.2.9
Checking for normal monitoring