5 - 1
5
1
OVERVIEW
2
BUS CONNECTION
3
DIRECT CONNECTION
TO CPU
4
COMPUTER LINK
CONNECTION
5
MELSECNET/10
CONNECTION (PLC TO
PLC NETWORK)
6
CC-Link CONNECTION
(INTELLIGENT DEVICE
STATION)
7
CC-Link CONNECTION
(Via G4)
8
ETHERNET
CONNECTION
MELSECNET/10
CONNECTION (PLC
TO PLC NETWORK)
5.1 System Configuration . . . . . . . . . . page 5-2
This section describes the equipment and cables needed
when connecting to MELSECNET/10 (PLC to PLC network).
Select a system suitable for your application.
5.2 Preparatory Procedures for Monitoring . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . page 5-7
This section describes the procedures to be followed
before monitoring in MELSECNET/10 connection (PLC to
PLC network).
The procedures are written on the step-by-step basis so
that even a novice GOT user can follow them to start
communications.
5.3 PLC Side Setting . . . . . . . . . . . . . page 5-24
The PLC side settings for GOT connection are explained.
When checking the PLC side settings, refer to this section.
5.4 Precautions . . . . . . . . . . . . . . . . . page 5-43
This section describes the precautions on MELSECNET/10
connection (PLC to PLC network).
Be sure to read this when establishing a MELSECNET/10
connection (PLC to PLC network).
5.5 List of Functions Added by Version Upgrade
. . . . . . . . . . . . . . . . . . . . . . . . . . page 5-44
This section describes the functions added by version
upgrade of GT Designer2 or OS.