21 - 24
21.3 Preparatory Procedures for Monitoring
21.3 Preparatory Procedures for Monitoring
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Confirming the temperature controller side setting
This section explains the GOT side setting.
When confirming the temperature controller side setting, refer to the following.
Section 21.4 Temperature Controller Side Setting
Install the OS onto the GOT.
Section 21.3.1
Installing OS onto GOT
Make sure that the OS is installed on the GOT.
Section 21.3.2
Checking OS installation on GOT
Set the communication interface. (Communication
settings)
Section 21.3.3
Setting communication interface
(Communication settings)
Download the project data.
Section 21.3.4
Downloading project data
Attach the communication unit and connect the cable.
Section 21.3.5
Attaching communication unit and
connecting cable
Make sure that the GOT recognizes the connected
equipment.
Section 21.3.6
Verifying GOT recognizes connected
equipment
Make sure that monitoring is performed normally.
Section 21.3.7
Checking for normal monitoring