9.3 Preparatory Procedures for Monitoring
9 - 23
9
CONNECTION TO
OMRON PLC
10
CONNECTION TO
KEYENCE PLC
11
CONNECTION TO
SHARP PLC
12
CONNECTION TO
TOSHIBA PLC
13
CONNECTION TO
HITACHI PLC
14
CONNECTION TO
MATSUSHITA PLC
15
CONNECTION TO
YASKAWA PLC
16
CONNECTION TO
YOKOGAWA PLC
9.3 Preparatory Procedures for Monitoring
The following the procedures to be taken before monitoring and corresponding reference sections.
Comfirming the PLC side setting
This section explains the GOT side setting.
When confirming the PLC side setting, refer to the following.
Section 9.4 PLC Side Setting
Install the OS onto the GOT.
Section 9.3.1
Installing OS onto GOT
Make sure that the OS is installed on the GOT.
Section 9.3.2
Checking OS installation on GOT
Set the communication interface.
(Communication settings)
Section 9.3.3
Setting communication interface
(Communication settings)
Download the project data.
Section 9.3.4
Downloading project data
Attach the communication unit and connect the cable.
Section 9.3.5
Attaching communication unit and
connecting cable
Make sure that the GOT recognizes the connected
equipment.
Section 9.3.6
Verifying GOT recognizes connected
equipment
Make sure that monitoring is performed normally.
Section 9.3.7
Checking for normal monitoring