4 - 1
4
1
OVERVIEW
2
BUS CONNECTION
3
DIRECT CONNECTION
TO CPU
4
COMPUTER LINK
CONNECTION
5
MELSECNET/10
CONNECTION (PLC TO
PLC NETWORK)
6
CC-Link CONNECTION
(INTELLIGENT DEVICE
STATION)
7
CC-Link CONNECTION
(Via G4)
8
ETHERNET
CONNECTION
COMPUTER LINK
CONNECTION
4.1 System Configuration . . . . . . . . . . page 4-2
This section describes the equipment and cables needed
for computer link connection.
Select a system suitable for your application.
4.2 Connection Cable . . . . . . . . . . . . page 4-17
This section describes the specifications of the cables
needed for establishing a computer link connection.
Check the specifications of the connection cables.
4.3 Preparatory Procedures for Monitoring . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . page 4-23
This section provides the procedures to be followed before
performing monitoring in computer link connection.
The procedures are written on the step-by-step basis so
that even a novice GOT user can follow them to start
communications.
4.4 PLC Side Setting . . . . . . . . . . . . . page 4-39
The PLC side settings for GOT connection are explained.
When checking the PLC side settings, refer to this section.