8.1 System Configuration . . . . . . . . . . page 8-2
This section describes the equipment and cables needed
when connecting to Ethernet.
Select a system suitable for your application.
8.2 Preparatory Procedures for Monitoring . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . page 8-4
This section describes the procedures to be followed
before monitoring in Ethernet connection.
The procedures are written on the step-by-step basis so
that even a novice GOT user can follow them to start
communications.
8.3 PLC Side Setting . . . . . . . . . . . . . page 8-20
The PLC side settings for GOT connection are explained.
When checking the PLC side settings, refer to this section.
8.4 Precautions . . . . . . . . . . . . . . . . . page 8-36
This section describes the precautions on Ethernet
connection.
Be sure to read this when establishing a Ethernet
connection.
8.5 List of Functions Added by Version Upgrade
. . . . . . . . . . . . . . . . . . . . . . . . . . page
8-37
This section describes the functions added by version
upgrade of GT Designer2 or OS.