EasyManuals Logo
Home>Mitsubishi>Touch terminals>GOT1000 Series

Mitsubishi GOT1000 Series User Manual

Mitsubishi GOT1000 Series
1216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #240 background imageLoading...
Page #240 background image
6 - 4
6.2 Preparatory Procedures for Monitoring
6.2 Preparatory Procedures for Monitoring
The following the procedures to be taken before monitoring and corresponding reference sections.
Confirming the PLC side setting
This section explains the GOT side setting.
When confirming the PLC side setting, refer to the following.
Section 6.3 PLC Side Setting
Install the OS onto the GOT.
Section 6.2.1
Installing OS onto GOT
Make sure that the OS is installed on the GOT.
Section 6.2.2
Checking OS installation on GOT
Set the communication interface.
(Communication settings)
Section 6.2.3
Setting communication interface
(Communication settings)
Download the project data.
Section 6.2.4
Downloading project data
Attach the communication unit and connect the cable.
Section 6.2.5
Attaching communication unit and
connecting cable
Make sure that the GOT recognizes the connected
equipment.
Section 6.2.6
Verifying GOT recognizes connected
equipment
Make sure that monitoring is performed normally.
Section 6.2.7
Checking for normal monitoring

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mitsubishi GOT1000 Series and is the answer not in the manual?

Mitsubishi GOT1000 Series Specifications

General IconGeneral
BrandMitsubishi
ModelGOT1000 Series
CategoryTouch terminals
LanguageEnglish

Related product manuals