BASIC OPERATION
J001/J003 6-44 SM
6.9 BASIC OPERATION
6.9.1 INITIALIZATION SEQUENCE AT POWER ON
Start: Power ON
↓
Operation Panel LED Check
↓
Vertical Motor (Transport Belt) Operation Check
↓
Maintenance Motor HP Check
↓
Carriage HP Check
↓
Waste Ink Tank Full Check
↓
Ink Level Check Inside Print Head
↓
Carriage All Scan Check
↓
Capping
↓
End