e-STUDIO556/656/756/856(Ver03) © 2012 TOSHIBA TEC CORPORATION All rights reserved
PREVENTIVE MAINTENANCE (PM)
7 - 40
7.9 Grease List
7.10 Operational Items in Overhauling
Overhaul each equipment with the following timing.
e-STUDIO556: When the number of output pages has reached 920,000 or 2.5 years have
passed from the start of use (Whichever is earlier)
e-STUDIO656: When the number of output pages has reached 1,030,000 or 2.5 years have
passed from the start of use (Whichever is earlier)
e-STUDIO756: When the number of output pages has reached 1,080,000 or 2.5 years have
passed from the start of use (Whichever is earlier)
e-STUDIO856: When the number of output pages has reached 1,200,000 or 2.5 years have
passed from the start of use (Whichever is earlier)
(1) Replace all the supplies.
(2) Check the components in the drive section (gears, pulleys, timing belts, etc.). Replace them with
new ones if they are damaged.
(3) Check all the adhesives such as tape and Mylar if they are damaged or have become unstuck.
Replace them with new ones if necessary.
(4) Check the performance of all the switches and sensors. Replace them with new ones if
necessary.
(5) Clean inside the equipment thoroughly.
Grease name Part name Volume Container
Parts list
Page Item
SI Silicon oil ASM-SILICON-1M 100cc Bottle 201 8
L Launa 40 OIL-LAUNA40-100 100cc Oiler 201 9
W White grease (Molykote EM-30) MOLYKOTE_EM-
30L_100G
100g Tube 201 12
AV Alvania No.2 ASM-PG-ALV2 100g Tube 201 11