SERVICE SCHEDULE
4 SERVICE
4
[8] PI [PI-110]
1. Periodic check (I) (Every 500,000 copies)
2. Periodic check (II) (Every 1,000,000 copies)
3. Periodic check (III) (Every 3,000,000 copies)
[9] PZ [PZ-108/109]
1. Periodic check (I) (Every 3,000,000 copies)
NO
Classification Service item
Number
of parts
replaced
Implementation classifica-
tion
Materials/tools
used
Clea-
ning
Inspe-
ction
Lubric
-ation
Replace
-ment
1
Paper feed sec-
tion
(1) Feed roller assembly/B
50BA-575*
2
z
Actual replacement
count: 100 K feeds
(2) Double feed prevention roller
assembly 13QN-443*
2
z
NO
Classification Service item
Number
of parts
replaced
Implementation classifica-
tion
Materials/tools
used
Clea-
ning
Inspe-
ction
Lubric
-ation
Replace
-ment
1 Paper feed
section
(1) Feed roller assembly/A
50BA-574*
2
z
Actual replacement
count: 200 K feeds
each
NO
Classification Service item
Number
of parts
replaced
Implementation classifica-
tion
Materials/tools
used
Clea-
ning
Inspe-
ction
Lubric
-ation
Replace
-ment
1
Paper feed sec-
tion
(1) Torque limiter 13QN4073*
2
z
Actual replacement
count: 600 K feeds
NO
Classification Service item
Number
of parts
replaced
Implementation classifica-
tion
Materials/tools
used
Clea-
ning
Inspe-
ction
Lubric
-ation
Replace
-ment
1
Punch section (1) Punch clutch
13NKK001*
1
z
Actual replacement
count: 1,000K times
2
Punch scraps
conveyance sec-
tion
(2) Punch scraps conveyance
motor 12GQ-417*
1
z
Actual replacement
count: 1,000K times
MODEL MANUAL REVISED EDITION DATE PAGE METHOD
SERVICE MANUAL Dec. 2003
7155/7165/7255/7272
4-15 REPLACEMENT