1.3 Commissioning process
1.3.1
Guide to the documentation
Sequence
The
commissioning
process
described in the following table represents an efficient suggestion
that is also discussed in the SINUMERIK training. The tasks shown in square brackets apply
to the numbers of the steps described in the training documents. The sections contained in
the manual that provide supplementary information to the training documents are specified as
references with page numbers in the right-hand column.
Overview
<B060> System overview "Commissioning CNC" (Page 9) Commissioning Manual
<B002> Commissioning and service tools "Commissioning CNC" (Page 11) Commissioning Manual
Basic information
<B061> Menu structure ---
<B021> Access levels
Date and time
"Commissioning CNC" (Page 37) Commissioning Manual
"Commissioning CNC"
(Page 40) Commissioning Manual
<B041> Parameterizing machine data "Commissioning CNC"
(Page 77) Commissioning Manual
<B035>
SINUMERIK Integrate Access MyMachine /P2P
Network configuration → Setting up drives
Online Help
Turning/Milling/Grinding/Universal Operating Manual
<B044> Checking and entering licenses "Commissioning CNC"
(Page 47) Commissioning Manual
<B045> Network configuration → Setting up drives Turning/Milling/Grinding/Universal Operating Manual
<B007> Electronic logbook "Hardware and Software" Service Manual
<B017> Data management "Commissioning CNC" Commissioning Manual
●
Introduction and use of data classes (Page 29)
● Easy Archive (Page 333
)
Configuration and diagnostics
<B010> PPU connection diagnostics
● System overview
● Digital inputs/outputs
"PPU and Components" Manual
<B030> Digital inputs/outputs → terminal assignment
Handwheels and measuring inputs
"Commissioning CNC" (Page 146) Commissioning Manual
<B051>
Line Modules, Motor Modules SINAMICS S120 Device Manual
<B053> Diagnostics
●
Drive system diagnostics
● Diagnostics and service → axes
"SINUMERIK Operate" Commissioning Manual /828D_IH9/
<B008> PROFINET connection diagnostics:
●
MCP 310C PN / MCP 483C PN
● MCP 310 USB / MCP 483 USB
● PP 72/48D PN and PP 72 / 48D 2/2A PN
"PPU and Components" Manual
Scope of delivery and requirements
1.3 Commissioning process
CNC commissioning
Commissioning Manual, 10/2015, 6FC5397-3DP40-5BA3 13