Installation
Transport System Installation
262 MagneMotion
Rockwell Automation Publication MMI-UM002F-EN-P - October 2022
5. Align the curve to curve motor joints, make sure that the tops of the motors are copla-
nar. Tighten the two M6 x 10 mm screws on each V-brace at that motor joint to
3.4 N•m [30 in•lb] with a T30 Torx bit.
6. Tighten the M6 bolt to 5.5 N•m [49 in•lb] with a 10 mm Hex socket to secure the
motor to the motor mount.
The Loctite must cure for 2 hours at 22° C [72° F] before using the transport system.
7. Repeat Step 3 at all straight motor to straight motor joints.
8. Repeat Step 4 at all curve motor to straight motor joints.
9. Repeat Step 5 at all curve motor to curve motor joints.
10. Repeat Step 6 at all motors.
Verify Motor and Switch Installation
Once all motors and switches are installed, the guideway must be checked to make sure of
proper movement of the vehicles (pucks) throughout the transport system. Run a vehicle
(puck) through the system to verify proper movement with no binding.