CHAPTER 4 INSTALLATION
4-36
COPYRIGHT
©
2001 CANON INC. 2000 2000 2000 2000 CANON iR8500/7200 REV.1 AUG. 2001
3 Unpacking and Installation (iR7200 Series)
3.1 Points to Note Before Starting the Work
Go through the following before starting to install the machine:
1. If the machine is moved from a cold to warm place, it can develop con-
densation in the form of droplets of water on its metal surfaces.
Use of the machine while it suffers from condensation can lead to image
faults. If the machine has been moved from a cold to warm place, be sure
to leave it for 1 hour or more without unpacking so that it becomes fully
used to the new place.
2. If stairs are used to move the machine into or out of the site of installa-
tion, keep the following in mind:
a. Take out the ADF, fixing/feeding assembly, holding tray assembly, and
copy paper, and carry them separately from the main body.
b. When lifting the machine, do not use the grips on the pickup assembly/
delivery assembly. Instead, be sure to support the machine at four cor-
ners of its bottom.
3. Shift up the 2 adjusters (front) found on the bottom of the machine to be
sure that they are unlocked. The adjusters can slip out of the bottom of
the machine because of vibration during transportation. Take care not to
loose them.
4. Be sure to work as a group of three or more. When removing the pad, in
particular, one must hold the rear grip and one the front grip, while the
other removes the pad.
5. Be sure to remove the options (side paper deck, finisher, paper folding
unit) when moving the machine into or out of the site of installation to
prevent damage.