7 Construction Mode
There will be a supplemental document provided with your controller to explain the start-up
procedure for the drive used. These additional steps must be performed before the car runs.
7.1 Main Power Setup
The following procedure describes how to setup the Main Power.
1. Verify that the main disconnect switch is in the OFF position.
2. Verify all green push breakers are in the up position (OFF).
Figure 115: Breakers in the OFF Position
3. Verify the L1/L2 breaker is in the OFF position.
• Green =OFF
• Red = ON
Figure 116: L1/L2 Breaker