EasyManuals Logo
Home>Xerox>All in One Printer>WorkCentre 5225

Xerox WorkCentre 5225 Service Manual

Xerox WorkCentre 5225
1457 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #349 background imageLoading...
Page #349 background image
February, 2008
2-326
WorkCentre 5225, 5230
024-351, 024-354
Launch Version
Status Indicator Raps
024-351 IOT-ESS Communication Failure 11 RAP
The NAK that notifies of the occurrence of a transmission failure is received. (The Packet num-
ber of the received Message Packet is incorrect.)
Initial Actions
Refer to BSD 3.1.
Procedure
Check that P/Js 402 on the MCU PWB (PL 9.1) and P/J 310 on the ESS PWB (PL 9.2) are
securely connected.
If the problem persists reload Firmware (ADJ 9.3.1).
024-354 IOT-ESS Communication Failure 14 RAP
The NAK that notifies of the occurrence of a transmission failure is received. (A parity error was
detected by hardware of the UART.)
Initial Actions
Refer to BSD 3.1.
Procedure
Procedure
Check that P/Js 402 on the MCU PWB (PL 9.1) and P/J 310 on the ESS PWB (PL 9.2) are
securely connected.
If the problem persists reload Firmware (ADJ 9.3.1).

Table of Contents

Other manuals for Xerox WorkCentre 5225

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Xerox WorkCentre 5225 and is the answer not in the manual?

Xerox WorkCentre 5225 Specifications

General IconGeneral
Maximum print sizeA3 (297 x 420 mm)
Internal memoryNo MB
TypeDigital copier

Related product manuals