February, 2008
2-618
WorkCentre 5225, 5230
116-382, 116-385
Launch Version
Status Indicator Raps
116-382 ABL Initialize RAP
HDD access by the ABL (Address Book Library) failed.
Initial Actions
Power Off/On
Procedure
Check the connection of each ESS PWB connector. The connectors are securely connected.
YN
Connect the connectors.
Switch on the power again. The problem persists.
YN
Return to Service Call Procedures.
Replace the ESS PWB (PL 9.2)
If the problem persists perform Hard Disk Diagnostic Program.
If the problem persists replace the HDD (PL 9.2).
116-385 IDC Software RAP
An internal shutdown occurred after an IDC (scripting language) processing error.
Initial Actions
Power Off/On
Procedure
Reinstall or replace the DIMM (PL 9.2).
If the problem persists reload Software (ADJ 9.3.1).
If the problem persists, replace the ESS PWB (PL 9.2).