5. Cut possible wire surplus material and spread
insulating varnish.
Rectifier check - (positive + side).
1. Using an ohmmeter, connect a probe to the rec-
tifier positive terminal; Alternatively, connect the
other probe to each one of the other rectifier neg-
ative terminals.
2. Repeat the same operation inverting the 2 ohm-
meter probes.
3. Make sure there is continuity only in one of the
two tests.
If continuity is detected in both tests, replace the
rectifier support.
Rectifier check - (negative - side).
1. With an ohmmeter, connect one of the two ohm-
meter probes to each rectifier negative terminal
and connect the other probe to each rectifier pos-
itive terminal.
Electrical system PORTER 1.3 16V
ES - 120