February, 2008
4-233
WorkCentre 5225, 5230
ADJ 11.6.1
Repairs and Adjustments
Launch Version
Figure 4 Position Adjustment of Half Rate Carriage 2/3 (j0st41130)
NOTE: The fixing position of the pulley can be changed if the tool holes of the Half Rate
Carriage and the rail are not aligned and the tool is not fixed in place. (Figure 5)
1. Loosen the screws (x2).
2. Turn the Pulley until the tool hole aligns.
3. Align the shaft with the Pulley end face and tighten the screws (x2).
Figure 5 Position Adjustment of Half Rate Carriage 3/3 (j0st41131)
7. Fix the tool to the tool hole on the frame and check the tool holes of the frame and the Full
Rate Carriage. (Figure 6)
NOTE: When adjusting the position of Full Rate Carriage from the rear side, to it with the
rear tool for Half Rate Carriage installed.
1. Fix the tool.
2. Secure it with a screw.