February, 2008
2-639
WorkCentre 5225, 5230
123-207, 123-209
Status Indicator Raps
Launch Version
123-207 Communication Manager Target RAP
A mailbox operations value is incorrect.
Initial Actions
Power Off/On
Procedure
Disconnect and reconnect the electrical connections on the UI PWB (PL 11.2) and P/J388 on
the ESS PWB (PL 9.2)
If the problem persists reload Software (ADJ 9.3.1).
If the problem persists replace the UI PWB (PL 11.2).
If the problem persists replace the ESS PWB (PL 9.2)
123-209 Controller UI Communication RAP
An incorrect check value is received during Controller UI Communications.
Initial Actions
Power Off/On
Procedure
Disconnect and reconnect the electrical connections on the UI PWB (PL 11.2) and P/J388 on
the ESS PWB (PL 9.2)
If the problem persists reload Software (ADJ 9.3.1).
If the problem persists replace the UI PWB (PL 11.2).
If the problem persists replace the ESS PWB (PL 9.2)